Small Project - Thomaston, GA
Completed in 2024 for Highline in Thomaston GA, this was an 85 mile FTTH project that added about 900 serviceable passings. The architecture was 90% aerial construction. We did both the aerial and underground construction as well as all of the splicing and activation. As part of the aerial construction, we did the make ready for most of the other communications utilities impacted. We also assisted their operations group with placing drops when needed.