This 400 mile FTTH project was completed in 2023 for Point Broadband that added about 3,500 serviceable passings. We installed and activated 10 FTTH cabinets. The architecture was 90% aerial construction. We did both the aerial and underground construction as well as all of the splicing and activation. As part of the aerial construction, we did the make ready for most of the other communications utilities impacted. We also assisted their operations group with placing drops when needed.